At Portlandia Electric Supply (PES), success is measured by the outcomes we deliver for our clients. From sourcing rare materials to managing large-scale logistics, PES consistently provides the precision, partnership, and progress that empower industries to achieve their goals.
Our clients trust us to simplify complexity, meet deadlines, and drive measurable impact. These success stories illustrate the value PES brings to every project we touch.
Delivering Precision for Utility-Scale Solar Projects
01
Client National Renewable Energy Developer
Challenge A 50 MW solar project faced delays due to sourcing issues for critical components, threatening project timelines and regulatory compliance.
Solution PES leveraged its extensive manufacturer network to secure the required materials at competitive prices. By optimizing logistics and coordinating phased deliveries, PES ensured materials arrived exactly when needed, reducing downtime.
Outcome -Project completed 15% ahead of schedule. -Saved the client over $250,000 in expedited shipping costs. -Improved overall project ROI by delivering materials on budget and on time.
Supporting Material Recovery for Industrial Retrofitting
02
Client: Large Industrial Manufacturer
Challenge: A $10M facility upgrade required rare End-of-Life (EOL) components that were no longer in active production. The client risked extended downtime and increased costs without these materials.
Solution: PES identified and recovered EOL components through its network of suppliers and facilitated a streamlined procurement process to minimize delays.
Outcome: -Prevented 4 months of operational downtime, saving the client millions in lost revenue. -Enabled the facility upgrade to be completed on schedule and within budget. -Highlighted PES’s ability to manage unique sourcing challenges.
Scaling Freight Operations for a National Contractor
03
Client Commercial Construction Firm
Challenge The client’s expansion into multiple states required consistent material deliveries across 12 sites, each with its own timeline and logistical demands.
Solution PES implemented a tailored freight solution using regional staging facilities and optimized delivery routes, reducing transit times and costs.
Outcome -Achieved 98% on-time deliveries across all 12 sites. -Reduced logistics costs by 20% through efficient routing and staging. -Enhanced the client’s ability to manage simultaneous projects without delays.
Scaling Freight Operations for a National Contractor
04
Client Residential Solar Installer
Challenge A local installer faced challenges accessing affordable materials in small quantities without incurring significant overhead costs.
Solution PES provided the client access to its multi-tier pricing model, allowing them to purchase materials at competitive rates without exceeding their budget.
Outcome: -Reduced material costs by 15% through custom pricing agreements. -Enabled the client to take on more projects by improving overall margins. -Strengthened the client’s ability to compete with larger firms in the market
Delivering Precision for Utility-Scale Solar Projects
05
Client Municipal Energy Authority
Challenge The client needed a sustainable supply chain solution for its renewable energy initiative, focusing on solar installations and EV infrastructure.
Solution PES sourced energy-efficient products from certified manufacturers and implemented a logistics strategy that minimized carbon emissions
Outcome -Reduced emissions by 30% through smarter freight solutions. -Helped the client achieve sustainability goals without compromising project timelines. -Strengthened the client’s position as a leader in municipal renewable energy initiatives.
Empowering Contractors Through PowerLink
06
Client: Independent Contractor Network
Challenge: Contractors struggled with inconsistent material availability and lacked access to competitive pricing.
Solution: Through the PowerLink ecosystem, PES provided real-time access to available inventory and tailored pricing solutions. Contractors were able to coordinate their projects efficiently and meet tight deadlines.
Outcome: -Enabled better project planning through predictable pricing models. -Enabled the facility upgrade to be completed on schedule and within budget. -Strengthened contractor-client relationships by delivering consistent results.
Why Clients Choose PES
These success stories illustrate how PES delivers value by combining precision sourcing, optimized logistics, and tailored solutions. Our commitment to sustainability, efficiency, and client success sets us apart as a trusted partner for projects of all sizes.
Let Us Write Your Success Story
Ready to see how PES can help you achieve your goals? Contact us today to learn how our solutions can empower your next project and ensure its success.