NEC Code Reference for Solar Installations (2026)

Key NEC Article 690 requirements for solar PV systems

NEC Article 690 — Solar Photovoltaic (PV) Systems

690.4 — Installation Requirements

  • All PV equipment must be listed for its intended use
  • Inverters must be listed to UL 1741
  • PV modules must be listed to UL 1703 or UL 61730
  • Rapid shutdown devices must be listed to UL 3741

690.7 — Maximum Voltage

PV system DC voltage is limited based on location and use:

Location Max Voltage Notes
1 & 2 family dwellings 600V Residential limit
Other than dwellings 1000V Commercial limit
Voltage correction Use Voc × temp correction NEC Table 690.7

690.8 — Circuit Sizing and Current

690.8(A)(1): PV circuit current = Isc × 1.25

690.8(B)(1)(a): Conductor ampacity = Isc × 1.25 × 1.25 = Isc × 1.5625

690.9 — Overcurrent Protection

  • Overcurrent protection required where conductor ampacity decreases
  • Minimum size: 125% of continuous current
  • DC-rated fuses/breakers required (not AC-rated)
  • Each PV string requires individual fuse if 3+ strings in parallel

690.10 — Stand-Alone Systems

  • Inverter output must supply the largest load (or have load management)
  • Battery circuits sized at 125% of inverter continuous output
  • Transfer equipment required if grid-connected backup

690.11 — DC Arc-Fault Circuit Interrupter

PV systems with DC conductors on or penetrating buildings must have DC AFCI protection. Detects and interrupts arcing faults on DC side.

690.12 — Rapid Shutdown

PV systems on buildings must have rapid shutdown that reduces:

  • Conductors outside the array boundary to 80V within 30 seconds
  • Conductors inside the array boundary to 80V within 30 seconds (2023 NEC)
  • Must be UL 3741 listed system or module-level electronics

690.13 — PV Disconnecting Means

  • Means to disconnect all ungrounded DC conductors
  • Must be readily accessible
  • Must be marked with rated voltage and current
  • Can be load-break rated or non-load-break (with warning label)

690.31 — Wiring Methods

  • Wiring must be rated for environment (sunlight, temperature, wet)
  • PV Wire or USE-2 for exposed module connections
  • THWN-2, XHHW-2 for conduit runs
  • MC4 connectors or equivalent for module interconnects
  • Conduit required when penetrating building envelope

690.41 — Grounding

  • One conductor of a 2-wire PV system must be grounded (for systems < 50V)
  • Systems ≥ 50V must have ground-fault detection and interruption
  • Ungrounded systems require ground-fault detection on both poles
  • Equipment grounding required for all exposed metal parts

690.46 — Ground-Fault Protection

All PV systems must have ground-fault detection and interruption (GFDI) for equipment and fire protection.

690.47 — Grounding Electrode System

PV systems must be connected to the building grounding electrode system. If separate electrode is installed, it must be bonded to the building system.

Other Relevant NEC Articles

Article Subject Relevance to Solar
NEC 210 Branch Circuits Inverter AC output wiring
NEC 240 Overcurrent Protection Breakers and fuses
NEC 250 Grounding and Bonding Equipment grounding, GEC
NEC 300 Wiring Methods Conduit, cable, installation
NEC 310 Conductors Wire sizing, ampacity
NEC 702 Optional Standby Systems Generator + transfer switch
NEC 705 Interconnected Power Grid-tie inverter connection