Remote telecom sites are the hardest power problem in the catalogue: unattended, deep-cycle, often 24/48V DC and sometimes required to run through a week of bad weather.

Powering Telecom and Remote Sites: Solar, Battery and DC Plant Design

Design for the worst weather week, not the average

A telecom site cannot shed load when the weather turns. Design starts with the DC load (often 24V or 48V at a few hundred watts), the required days of autonomy, and the site's worst-month insolation. A site that runs on 500W average becomes a 3-4kW array once the winter derate and autonomy are applied.

DC-coupled architectures dominate here: the load is natively DC, so avoiding an inverter removes a conversion loss and a failure point.

Remote site sizing chain

Input Typical value Drives
DC load 200-600W continuous Battery kWh and array size
System voltage 24V or 48V DC Conductor sizing and equipment selection
Autonomy 3-7 days Battery bank size - the dominant cost
Worst-month insolation 2-4 kWh/m2/day Array wattage
Temperature range -30 to +50°C Battery chemistry choice and enclosure thermal design

Battery chemistry is a site decision

LFP gives usable depth and cycle life but needs thermal management where winters are hard - charging below freezing damages cells. AGM or gel tolerates cold charging but gives roughly half the usable capacity and a shorter cycle life. Many operators end up with a heated LFP enclosure plus a generator for the worst weeks; the generator is the cheapest kilowatt-hour of autonomy.

Designing a remote site power system

  1. 1

    Establish the DC load profile

    Average and peak current at the system voltage, including radio equipment duty cycles and any heating.

  2. 2

    Choose system voltage

    24V for smaller loads, 48V above roughly 1kW to keep conductor sizes sane over long runs.

  3. 3

    Size the battery for autonomy

    Use usable kWh, apply a temperature derate, and accept the generator as the last line of defence.

  4. 4

    Size the array for the worst month

    Worst-month insolation plus a soiling/snow allowance; oversizing here is cheaper than more battery.

  5. 5

    Design the enclosure

    Thermal management, ventilation, intrusion and remote monitoring - the site is unattended by definition.

Frequently Asked Questions

Why do telecom sites use 48V DC?
It is the historical plant voltage, keeps current manageable for hundreds of watts to a few kilowatts, and matches the radio equipment's native input.
Is LFP suitable in cold climates?
Yes with heating or charge-disable below freezing. Without thermal management, cold charging damages cells and voids most warranties.
Do remote sites still need a generator?
Often, yes - as the cheapest way to cover the worst week rather than sizing battery and array for a once-a-decade event.

Plan a remote site power system with us

Get trade pricing, freight quotes, and portal calculators.

Register Now

About the author

David Ochs - Off-Grid & Rural Systems Editor. Expertise: Off-grid solar, rural electrification, RV/marine, cabin systems. Written for contractors and integrators buying through PES Supply.

More by David Ochs: