Sourcing and buying guides
Every guide PES Supply publishes for contractors, integrators and facilities teams - grouped by the decision you are actually making. Each one explains what to check before you specify or order, and links the stock we hold. For line-item trade pricing on any list, use the quote desk.
Solar modules
- 300-400W panels - Retrofit and budget arrays where smaller modules fit legacy rail spacing.
- 400W panels - The volume workhorse class: 20-24 modules for an 8-10kW roof.
- 450-550W panels - Mainstream commercial class - fewer modules, less labor per kW.
- 550W-700W panels - Ground-mount and large commercial: footprint and 1500V discipline.
- 700W+ panels - Utility-scale formats, longer strings, equipment-assisted handling.
Inverters and controllers
- Microinverters - Module-level conversion, rapid shutdown built in, per-panel monitoring.
- String inverters 7.6-11.4kW - The residential workhorse size class and its MPPT limits.
- Hybrid inverters 3-8kW - Cabin and small-home systems with battery input built in.
- Hybrid inverters 10-12kW - Whole-home backup with a 10-15kW array and battery bank.
- Commercial inverters 12kW+ - Three-phase, 480V, DC/AC ratio and interconnection standards.
- Off-grid inverter/chargers - Standalone systems: charging, transfer behaviour and battery profiles.
- MPPT controllers 60-100A - Rated by output current, not array watts - sizing at 12/24/48V.
Generators and transfer equipment
- Standby 14-22kW - Whole-home backup once load management is in the design.
- Standby 22-26kW - Top of air-cooled residential, entry to light commercial.
- Commercial 30kW+ - Liquid-cooled systems: fuel autonomy, rigging, emissions permitting.
- Portable 2-7kW - Job sites and short outages: starting watts and CO safety.
- Portable 7-12kW - Real backup power in a portable package with a transfer switch.
- 200A transfer switches - Service-entrance vs standalone, NEMA ratings, load management.
Generator sizing, fuel and warranty
- Standby generator sizing - from service amperage to kW - load calculation, motor starting, transfer switch rating and the fuel derate.
- Generator fuel and tank sizing - propane consumption by size class, tank vaporization limits and how many days of runtime a tank really buys.
- Generac extended warranty - the 5/7/10-year extension price ladder, the year-one activation deadline and what actually voids a claim.
Storage
- 48V LiFePO4 banks - Standard off-grid bus voltage: usable capacity and BMS protocol.
- 100-200Ah batteries - Cabins, vans and small backup banks - LFP vs AGM.
- 200Ah batteries - The workhorse capacity for off-grid and mobile systems.
Racking, wire and balance of system
- Racking rail and clamps - Roof attachment, wind/snow spans and clamp zones.
- Ground-mount racking - Piles vs ballast, soil reports and array geometry.
- PV wire and THHN - Voltage rating, sunlight resistance and ampacity derating.
- Electrical supplies - Boxes, lugs, disconnects and the parts that finish a job.
- BOS accessories - Combiners, disconnects, monitoring and cable management.
Kits and EV
- Pre-configured solar kits - Compatibility risk moves to the supplier - landed cost matters.
- Level 2 EV chargers - 40A vs 48A, circuit sizing and rebate eligibility.
Brand hubs
- Generac generators - The full Generac line: standby, portable and transfer switches.
Recent sourcing articles
- Wholesale solar panel pricing in 2026 - quantity tiers, freight class and vintage risk.
- Buying a standby generator at wholesale - sizing, fuel, transfer switch and freight.
- Solar kit vs component build - where each path quietly adds cost.
Design and specification
- Reading a solar panel datasheet - the five numbers that actually decide string length, conductors and inspection.
- 48V vs high-voltage battery architecture - the first battery decision: inverter shortlist, conductor cost and expansion path.
Commercial systems and compliance
- Commercial BESS sizing - from interval data to interconnection; demand shaving, TOU arbitrage and NFPA 855.
- Buying refrigerant wholesale - the EPA 608 certificate gate, cylinder rules and DOT hazmat shipping.
- Buy America(n) documentation - the paperwork a federally funded solar bid actually needs.
Design, conductors and freight
- Sizing PV and battery conductors - ampacity, conditions-of-use derating and voltage drop in the right order.
- Off-grid cabin design - loads, autonomy, winter array derating and generator backup.
- Module freight economics - pallet quantity, delivery conditions and staging versus landed cost.
System economics and design ratios
- DC/AC ratio and clipping - why oversizing DC is normal, and when clipping actually costs money.
- Export rates and system economics - how falling export credit shifts the design from production to self-consumption.
Loads, structure and electrification
- Generator sizing for motor loads - starting watts, locked rotor and why load management beats a bigger unit.
- Racking wind and snow loads - the design inputs a permit reviewer wants, and the clamp-zone trap.
- Heat pump + solar panel capacity - Article 220 load math, the 120% busbar rule and load management.
Installation and logistics
- Level 2 EV charger installation - 48A needs a 60A circuit: service capacity, the 120% busbar rule and load management.
- Freight damage and shortages - how to document at delivery so a claim actually pays.
Datasheets and remote sites
- Reading an inverter datasheet - MPPT window, max DC voltage, per-MPPT current, derating and weighted efficiency.
- Telecom and remote site power - DC load profile, autonomy, worst-month insolation and chemistry in cold climates.