Battery Runtime Calculator: Ah to Hours With DoD & Inverter Losses

PES Supply, a PES Global Group Company
· 11 min read PES Engineering Desk — reviewed by a licensed master electrician
Battery runtime calculator hero — dark technical illustration, Portlandia Electric Supply

Table of Contents

    "How long will the battery last?" is the first question every backup-power customer asks and the one most online calculators answer badly — usually by ignoring depth of discharge, inverter losses, or both. This calculator does the full chain: battery capacity in amp-hours or watt-hours, derated by the chemistry-appropriate depth of discharge, derated again by inverter efficiency, divided by your actual load in watts. The result is the runtime number you can plan around, not the marketing number on the box.

    We already publish a Battery Backup Runtime guide with quick-reference charts — think of this page as the deeper interactive version: full control over DoD, efficiency, and load, plus the engineering math to verify any answer by hand.

    Battery Runtime Calculator

    Ah/Wh × depth of discharge × inverter efficiency ÷ load · LFP, AGM, gel & flooded presets

    Nameplate energy—
    Usable energy (after DoD)—
    Delivered to AC load (after efficiency)—
    Estimated runtime—
    High discharge rate — at loads above ~0.5C, lead-acid usable capacity shrinks further (Peukert effect). Real runtime may be 10–25% shorter. LFP is far less affected.

    Method: Runtime (h) = (V × Ah × DoD × efficiency) ÷ load watts. Sizing a new bank? Use the home battery bank sizing guide to work backward from the hours you need.

    The Runtime Formula and Why Every Term Matters

    Battery runtime is a four-step derating problem, and skipping any step produces a fantasy number:

    Runtime (hours) = (Voltage × Amp-hours × DoD × Inverter efficiency) ÷ Load watts

    Step 1 — nameplate energy. Voltage × amp-hours gives watt-hours, the only honest unit of stored energy. A 48 V × 100 Ah bank holds 4,800 Wh; a 12 V × 100 Ah battery holds 1,200 Wh. Same amp-hours, four times the energy. This is why comparing batteries on Ah alone is meaningless.

    Step 2 — depth of discharge. Lead-acid chemistries (flooded, AGM, gel) live short, unhappy lives below 50% DoD, so only half the nameplate is practically usable. LiFePO4 comfortably delivers 80–100% — we use 90% as the planning figure — which is a large part of why LFP beats AGM on cost per delivered kilowatt-hour over the battery's life.

    Step 3 — inverter efficiency. Converting DC to AC costs 5–15% of the energy. A quality hybrid like the EG4 18kPV runs in the low-to-mid 90s; budget modified-sine units can waste 15% and damage sensitive loads while they're at it. DC-only loads (lights, USB, RV circuits) skip this loss entirely.

    Step 4 — divide by load. Watts, measured at the wall, not guessed from nameplates. A "1,500 W" space heater on medium may draw 900 W; a fridge rated 700 W averages 100–150 W across a day because the compressor cycles.

    Worked Example 1: 48 V 100 Ah LFP Server Rack Battery

    The most common battery we sell — a 48 V, 100 Ah LiFePO4 module like the EG4 LifePower4 — feeding a 500 W critical-loads panel through a 92%-efficient hybrid inverter:

    Runtime = (48 × 100 × 0.90 × 0.92) ÷ 500 = 3,974 ÷ 500 = 7.9 hours

    Two rack modules in parallel double it to ~15.9 hours. Three modules cover a full night for a typical critical-loads panel — which is why the 15 kWh class in our 15–30 kWh battery collection is the sweet spot for overnight backup.

    Worked Example 2: 12 V 200 Ah AGM Bank

    A pair of 12 V 100 Ah AGM batteries in parallel (12 V, 200 Ah total) running a 300 W RV load through an 85%-efficient inverter:

    Runtime = (12 × 200 × 0.50 × 0.85) ÷ 300 = 1,020 ÷ 300 = 3.4 hours

    The same money in a single 12 V 200 Ah LFP at 90% DoD and 92% efficiency delivers 6.6 hours — nearly double the runtime — before you even count cycle life. For charging-side math on small systems like this, see how long a 200 W panel takes to charge a 12 V 100 Ah battery.

    Worked Example 3: Whole-Home 51.2 V 280 Ah LFP

    A 14.3 kWh wall-mount bank (51.2 V × 280 Ah) carrying a 1,000 W average home load at 92% efficiency:

    Runtime = (51.2 × 280 × 0.90 × 0.92) ÷ 1,000 = 11,870 ÷ 1,000 = 11.9 hours

    That is an evening through sunrise for a disciplined home. Pair it with the Solar Panel Sizing Calculator to confirm the array can refill 14 kWh the next day.

    Depth of Discharge Reference by Chemistry

    Chemistry Planning DoD Typical cycle life @ that DoD Notes
    LiFePO4 (LFP) 90% 4,000–6,000 cycles BMS-limited; 100% possible but trims lifespan
    AGM 50% 400–600 cycles 80% DoD drops life to ~250 cycles
    Gel 50% 500–800 cycles Slow-charge only; heat sensitive
    Flooded (FLA) 50% 300–500 cycles Needs watering and venting

    Runtime Quick Table: 48 V 100 Ah LFP (90% DoD, 92% inverter)

    Load Runtime What that load looks like
    200 W 19.9 h Fridge cycling + lights + router
    500 W 7.9 h Critical-loads panel, disciplined use
    1,000 W 4.0 h Fridge + window AC fan + TV
    2,000 W 2.0 h Microwave use + kitchen circuits
    3,500 W 1.1 h Window AC running continuously
    5,000 W 0.8 h Near the limit of one 100 Ah module's BMS

    Battery Bank Sizing Quick Reference (Overnight, 10 h autonomy)

    Working backward from a target: required bank Wh = load W × 10 h ÷ DoD ÷ 0.92 inverter efficiency. Common scenarios on LFP at 90% DoD:

    Overnight load Required bank Practical build
    200 W 2,415 Wh 1 × 12 V 200 Ah LFP or 1 × 24 V 100 Ah
    400 W 4,831 Wh 1 × 48 V 100 Ah rack module
    800 W 9,662 Wh 2 × 48 V 100 Ah modules (~10 kWh)
    1,200 W 14,493 Wh 1 × 14.3 kWh wall-mount or 3 rack modules
    2,000 W 24,155 Wh 2 × 14.3 kWh wall-mounts or 5 rack modules

    On AGM at 50% DoD every row nearly doubles — 400 W overnight needs about 8.7 kWh of lead-acid nameplate, which is four 12 V 200 Ah AGMs weighing ~520 lb. The same job in LFP is one rack module at ~100 lb. Weight, floor space, and cycle life all tilt the same direction.

    Temperature, Age, and Other Real-World Derates

    The formula assumes a healthy battery at room temperature. Cold hits lead-acid hard: at freezing, an AGM delivers roughly 80% of its rated capacity, and charging below freezing risks damage. LFP holds capacity better in the cold but most BMS units block charging below 0 °C entirely — a runtime-only concern in winter outages if the battery can't also recharge. Age is the quieter derate: a five-year-old AGM bank may hold 70–80% of nameplate even when well maintained. For outage planning on older banks, measure with a controlled discharge or shave 20% off the math. Finally, inverter standby draw — typically 20–60 W with no load — runs 24/7 whenever the inverter is on, quietly consuming 0.5–1.4 kWh per day that never reaches an appliance. On small banks, idle draw alone can eat 10–25% of stored energy overnight.

    Inverter Efficiency Reference

    Inverter class Typical efficiency Impact on 4,800 Wh bank
    Premium hybrid (48 V) 94–96% 4,512–4,608 Wh delivered
    Typical hybrid/AIO 90–93% 4,320–4,464 Wh delivered
    Budget pure sine 85–90% 4,080–4,320 Wh delivered
    Modified sine 80–85% 3,840–4,080 Wh — plus waveform risk
    DC loads only ~100% 4,800 Wh delivered (no conversion)

    Common Battery Runtime Mistakes

    1. Using nameplate watt-hours as usable energy. On lead-acid that overstates runtime by 2×. On LFP it still overstates by 10%.
    2. Forgetting inverter losses. A 90%-efficient inverter turns a calculated 10 hours into 9. On multi-day autonomy plans, that lost hour compounds.
    3. Ignoring the Peukert effect on lead-acid. Lead-acid capacity is rated at a 20-hour discharge. Pull at 0.5C or faster and usable capacity drops 10–25% below the math. LFP's flat curve makes it nearly immune at normal loads.
    4. Sizing to surge instead of average. Runtime cares about average watts; the inverter's surge rating handles motor starts. Conflating the two oversizes the battery or undersizes the inverter.
    5. Believing "10 kWh" labels blindly. Some brands label by cell energy before BMS reserves. Reputable lines like EG4, Fortress, and SimpliPhi publish usable figures — check the datasheet, not the sticker.
    6. Deep-cycling lead-acid daily. The 20/80 battery rule exists for a reason: habitual 80%+ discharges on AGM cut calendar life to a fraction of spec.

    Measuring Your Real Load (The Step Everyone Skips)

    Every runtime answer is only as good as the load figure feeding it. Nameplate watts overstate steady draw on anything with a compressor or thermostat and understate it on resistive heaters at full tilt. The reliable approach: plug suspect loads through an inexpensive plug-in watt-meter for 24 hours and use the average, not the peak. For whole-panel figures, clamp meters and energy monitors on the critical-loads panel give you the honest hourly profile — and usually reveal that your "essential" loads are 30–40% smaller than feared, which translates directly into either longer runtime or a smaller, cheaper battery bank.

    Working Backward: From Hours Needed to Bank Size

    Flip the formula to design a bank: Required Wh = Load W × hours needed ÷ DoD ÷ efficiency. Need 500 W for 10 hours on LFP at 92%? That's 500 × 10 ÷ 0.90 ÷ 0.92 = 6,039 Wh ≈ a 48 V 130 Ah bank — in practice, two 100 Ah modules for margin. The home battery bank sizing guide covers multi-day autonomy, and our off-grid storage sizing guide layers solar recharge on top. When the outage risk is measured in days, not hours, run the Generator Sizing Calculator alongside this one — batteries and generators solve different outage shapes.

    Ready to price the bank? Start with our 10 kWh batteries for critical loads or the 15–30 kWh range for overnight whole-home coverage, or hit "Get this quoted" above and we'll build the bill of materials from your numbers.

    Frequently Asked Questions

    How do I convert amp-hours to watt-hours?

    Multiply amp-hours by the battery's nominal voltage: 100 Ah × 48 V = 4,800 Wh (4.8 kWh). Never compare Ah across different voltages — a 100 Ah 12 V battery stores a quarter of the energy of a 100 Ah 48 V battery.

    What depth of discharge should I use for LiFePO4?

    90% is the standard planning figure. LFP can technically discharge to near 100%, but holding 10% in reserve extends cycle life and keeps the BMS from cutting power at the worst moment. Most manufacturers warranty 80–100% DoD; check your datasheet.

    Why is my real runtime shorter than the calculation?

    The usual suspects: inverter standby draw (20–60 W even at idle), loads larger than measured, battery capacity faded with age, cold ambient temperatures (lead-acid loses ~20% at freezing), and the Peukert effect on lead-acid at high discharge rates. Measure loads at the wall and re-run the numbers.

    Does a bigger inverter reduce runtime?

    Indirectly, yes. Larger inverters have higher idle draw and often worse efficiency at light loads. An 18 kW hybrid running a 300 W load may operate well below its peak-efficiency band. Match inverter size to realistic loads, not worst-case fantasies.

    Can I mix old and new batteries in one bank?

    Avoid it. Mixed-age lead-acid banks charge and discharge unevenly, dragging the new batteries down to the old ones' level. Even in LFP, mixing capacities or brands complicates BMS coordination. Expand with identical modules within the manufacturer's supported window.

    How many batteries do I need for overnight backup?

    Add your overnight loads in watts, multiply by hours (typically 10–12), then divide by DoD and inverter efficiency. A 400 W overnight load × 12 h ÷ 0.90 ÷ 0.92 ≈ 5,800 Wh — one 48 V 100 Ah LFP plus margin, or two for comfort. Run your exact numbers in the calculator above.

    Related Products

    Shop the products mentioned in this guide and get everything you need for your project.

    EG4 Electronics LiFePower4 48V V2 100Ah Lithium Iron Phosphate Battery - EG4LP48V100AV2

    EG4 Electronics LiFePower4 48V V2 100Ah Lithium Iron Phosphate Battery - EG4LP48V100AV2

    EG4 Electronics

    $1,470.99

    View Product
    Trojan 225AH 12V Flooded Battery - J185H-AC

    Trojan 225AH 12V Flooded Battery - J185H-AC

    Trojan Battery

    $630.00

    View Product
    Victron SmartSolar MPPT 150/100-MC-4 VE.Can Charge Controller - SCC115110511

    Victron SmartSolar MPPT 150/100-MC-4 VE.Can Charge Controller - SCC115110511

    Victron Energy

    $590.00

    View Product

    Related PES Supply guides

    Need Help Sizing This?

    Our team can help you calculate loads, select the right equipment, and source everything from one PO.

    📞 (502) 790-0600

    Email Our Team
    Solar Panels Generators Batteries / ESS EV Chargers Circuit Breakers Charge Controllers

    One PO. One Invoice. Every Trade Covered.

    PES Supply is the distribution arm of PES Global Group — 50,000+ SKUs from 169 authorized brands, LTL freight shipping from Louisville, KY.

    Get a Quote
    Share: X f in @

    Related Articles

    NEC 310.16 Ampacity Table (2026): Copper & Aluminum by Gauge

    Oct 19, 2026

    EV Charger Breaker Sizing Chart (NEC 625)

    Oct 18, 2026

    Flex Duct CFM Chart: Every Size from 4″ to 18″ (2026 Guide)

    Oct 18, 2026
    MidNite Hawke's Bay vs Victron MPPT RS: 100A Face-Off

    MidNite Hawke's Bay vs Victron MPPT RS: 100A Face-Off

    Oct 17, 2026
    Friday Floor Scan: 5 Quiet Workhorses Worth a Second Look

    Friday Floor Scan: 5 Quiet Workhorses Worth a Second Look

    Oct 16, 2026
    This Week in Power & Solar: Factory Paper, Tandem Clocks, and the Tariff Floor (Oct 11)

    This Week in Power & Solar: Factory Paper, Tandem Clocks,...

    Oct 11, 2026
    Smart Load Management: EV Charging on a 100A Panel (No Service Upgrade)

    Smart Load Management: EV Charging on a 100A Panel (No Se...

    Oct 11, 2026
    LFP Battery Prices in 2026: The Floor Is Close — What to Buy Now

    LFP Battery Prices in 2026: The Floor Is Close — What to ...

    Oct 11, 2026
    How Wind Loads Affect Solar Panel Selection and Mounting

    How Wind Loads Affect Solar Panel Selection and Mounting

    Oct 10, 2026
    Solar Panel Fire Safety: What Installers and Building Owners Should Know

    Solar Panel Fire Safety: What Installers and Building Own...

    Oct 08, 2026
    New on the Floor: Five Project Kits That Just Landed

    New on the Floor: Five Project Kits That Just Landed

    Oct 03, 2026
    Winter Storm Season: Portable Generator Demand Climbs — What to Stock Now

    Winter Storm Season: Portable Generator Demand Climbs — W...

    Oct 02, 2026
    String Inverter vs Microinverter vs Power Optimizer: How the Architecture Changes

    String Inverter vs Microinverter vs Power Optimizer: How ...

    Oct 01, 2026
    Low-Light Solar Performance: Which Panels Produce More Energy on Cloudy Days?

    Low-Light Solar Performance: Which Panels Produce More En...

    Sep 27, 2026
    Solar Panel Pallets vs Containers: Which Buying Option Saves More Money?

    Solar Panel Pallets vs Containers: Which Buying Option Sa...

    Sep 19, 2026
    Solar Panels + EV Charging: How to Build an Energy-Efficient Home

    Solar Panels + EV Charging: How to Build an Energy-Effici...

    Sep 13, 2026
    Solar Panel Wholesale Pricing: What Installers Should Know in 2026

    Solar Panel Wholesale Pricing: What Installers Should Kno...

    Sep 08, 2026
    Solar Microgrids: How Communities Can Build More Resilient Energy Systems

    Solar Microgrids: How Communities Can Build More Resilien...

    Sep 07, 2026
    AI + Solar Energy: How Artificial Intelligence Is Changing Solar System Design

    AI + Solar Energy: How Artificial Intelligence Is Changin...

    Sep 05, 2026
    Volts to amps calculator hero — dark technical illustration, Portlandia Electric Supply

    Volts to Amps Conversion: How to Calculate Amps from Volt...

    Sep 04, 2026
    MWh to kWh conversion calculator hero — dark technical illustration, Portlandia Electric Supply

    MWh to kWh Conversion: Megawatt-Hours to Kilowatt-Hours C...

    Sep 04, 2026
    Watts to kilowatts calculator hero — dark technical illustration, Portlandia Electric Supply

    Watts to Kilowatts Conversion: W to kW Calculator + Chart...

    Sep 04, 2026
    kVA to amps calculator hero — transformer with glowing phase waveforms, Portlandia Electric Supply

    kVA to Amps Calculator: Single-Phase & Three-Phase Conver...

    Sep 04, 2026
    Milliamps to amps conversion calculator hero — dark technical illustration, Portlandia Electric Supply

    mA to Amps Conversion: Milliamps to Amps Calculator + Cha...

    Sep 04, 2026
    Wire ampacity calculator hero — copper cable gauges with glowing current, Portlandia Electric Supply

    Wire Ampacity Calculator (NEC 310.16): Copper & Aluminum ...

    Sep 04, 2026
    Generator sizing calculator hero — dark technical illustration, Portlandia Electric Supply

    Generator Sizing Calculator: Running + Starting Watts to ...

    Sep 04, 2026
    Solar panel sizing calculator hero — rooftop array with dimension lines, Portlandia Electric Supply

    Solar Panel Sizing Calculator: How Many Panels Does Your ...

    Sep 04, 2026
    Voltage drop calculator hero — cable run with voltage waveform, Portlandia Electric Supply

    Voltage Drop Calculator: NEC 3%/5% Rule, Formula & Wire S...

    Sep 04, 2026
    Off-grid battery bank sizing calculator hero — stacked battery rack, Portlandia Electric Supply

    Off-Grid Battery Bank Sizing Calculator: kWh, Amp-Hours &...

    Sep 04, 2026
    Solar payback calculator hero — rooftop array with ascending savings curve, Portlandia Electric Supply

    Solar Payback Calculator: Payback Period & 25-Year Saving...

    Sep 04, 2026
    EV charger circuit calculator hero — charging cable and breaker panel, Portlandia Electric Supply

    EV Charger Circuit Calculator: Breaker & Wire Size per NE...

    Sep 04, 2026
    Service entrance load calculator hero — meter base and panel line art, Portlandia Electric Supply

    Service Entrance Load Calculator: NEC 220 Standard Method...

    Sep 04, 2026
    Conduit bending calculator hero — EMT offset bend with angle guides, Portlandia Electric Supply

    Conduit Bending Calculator: Offset Multiplier & Shrinkage...

    Sep 04, 2026
    LADWP and Investor-Owned Utility RFPs - A Bidder's Guide for Electrical and Renewable Equipment Supply

    LADWP and Investor-Owned Utility RFPs - A Bidder's Guide ...

    Sep 01, 2026
    Federal Contractor Buy-American Electrical Requirements - FAR 52.225 Compliance for Electrical, Solar, and Grid Equipment

    Federal Contractor Buy-American Electrical Requirements -...

    Sep 01, 2026
    State Cooperative Purchasing Programs for Electrical Equipment - Sourcewell, OMNIA, TIPS, NASPO ValuePoint

    State Cooperative Purchasing Programs for Electrical Equi...

    Sep 01, 2026
    Federal Solar RFP Response Template Library - Section L/M Compliance, Past Performance, and Bid Package Structure

    Federal Solar RFP Response Template Library - Section L/M...

    Sep 01, 2026
    GSA Schedule Roadmap for Electrical and Solar Suppliers - Multiple Award Schedule Application, Award, and Task Order Workflow

    GSA Schedule Roadmap for Electrical and Solar Suppliers -...

    Sep 01, 2026
    BABA Compliance for Electrical and Solar Equipment - 2 CFR 184, the 55% Rule, and How to Source Compliant Product

    BABA Compliance for Electrical and Solar Equipment - 2 CF...

    Sep 01, 2026
    HVAC Contractor Pallet Freight and LTL Guide: Hazmat Routing, DOT Compliance, and Landed Cost Economics

    HVAC Contractor Pallet Freight and LTL Guide: Hazmat Rout...

    Sep 01, 2026
    Commercial HVAC Refrigerant Compliance for Facility Managers: 40 CFR Part 82, Leak Repair Thresholds, and Penalty Avoidance

    Commercial HVAC Refrigerant Compliance for Facility Manag...

    Sep 01, 2026
    HVAC Service Tools Brand Selector: Fieldpiece vs Testo vs Fluke Digital Manifolds, Gauges, and Leak Detectors

    HVAC Service Tools Brand Selector: Fieldpiece vs Testo vs...

    Sep 01, 2026
    Refrigerant Recovery Equipment Buying Guide: Bacharach vs CPS vs Fieldpiece vs Yellow Jacket vs Appion

    Refrigerant Recovery Equipment Buying Guide: Bacharach vs...

    Sep 01, 2026
    PES Refrigerant Subscription Program: Recurring Pallet Delivery for HVAC Contractors

    PES Refrigerant Subscription Program: Recurring Pallet De...

    Sep 01, 2026
    EPA 608 Certification Guide: Type I, II, III, and Universal Testing Paths for HVAC Contractors

    EPA 608 Certification Guide: Type I, II, III, and Univers...

    Sep 01, 2026
    R-454B Transition Guide for HVAC Contractors: 2025 AIM Act, R-410A Phasedown, and Equipment Retrofits

    R-454B Transition Guide for HVAC Contractors: 2025 AIM Ac...

    Sep 01, 2026
    HVAC Contractor Refrigerant Buying Guide: R-410A, R-134a, R-22 Bulk Pricing & Hazmat Shipping

    HVAC Contractor Refrigerant Buying Guide: R-410A, R-134a,...

    Sep 01, 2026
    EPA Section 608 certification exam types and passing scores chart — PES Supply

    EPA Section 608 Certification: Complete Study Guide (Type...

    Aug 30, 2026

    R-410A Phase-Down 2026: What HVAC Contractors Need to Know

    Aug 29, 2026

    Get Price Drops & Product Releases

    Weekly digest for installers and project managers — price drops, new stock, NEC code updates.

    Portlandia Electric Supply